FWS - Pixley NWR Water Recirculation Design-Build
INTERIOR, DEPARTMENT OF THE · DEPARTMENTAL OFFICES · FWS CONTRACTING ACTIVITY
- Response Deadline
- 2026-11-30 (8d left)
- Location
- Falls Church, VA Buying office: VA; work location not supplied
- Solicitation / Notice ID
- 140FF027R0003 · NoticeId: 88b31d0386cc489680a8118477836ff9
- Primary Contact
- Anderson, Terrenceterrence_anderson@ios.doi.gov6822940280
Scope Summary (Sanitized Plain Text from SAM.gov)
This is a combined synopsis/solicitation for commercial services prepared in accordance with Revolutionary FAR Overhaul (RFO) Part 12, as supplemented with additional information included in this notice. This announcement constitutes only solicitation. Offers are being requested, and a separate written solicitation will not be issued. The U.S. Fish & Wildlife Service, Pixley National Wildlife Refuge provides 755 acres of wetland habitat for migratory waterfowl and other water birds and relies on three deep groundwater wells for irrigation and flooding. This project will improve water reuse and reduce groundwater pumping demands, particularly during drought years. The contractor shall design and construct a water recirculation system consisting of approximately 1.2 miles of PVC pipeline connecting the wetlands¿ lowest topographical point to the existing pipeline farther east. The system shall include a pump at this low point to move water upslope for recirculation and critical irrigation. The contractor shall secure the pump station with a 12-foot-tall, gated chain-link enclosure topped with barbed wire. Excavated soil may be reused on refuge property, and restoration or seeding of…
Source extract: Sun, 22 Nov 2026 04:30:19 GMT. SAM.gov is the sole authoritative legal record. Verify amendments, Q&A, and mandatory site visits on SAM.gov.