A-E Redesign of Deterrence Park, Offutt AFB, NE
DEPT OF DEFENSE · DEPT OF THE AIR FORCE · FA4600 55 CONS PKP
- Response Deadline
- 2026-12-03 (11d left)
- Location
- Offutt AFB, NE Work location: NE
- Solicitation / Notice ID
- A071835 · NoticeId: 90c7dc5b61434464a1c7439c2e9866f0
- Primary Contact
- Joseph Impallariajoseph.impallaria.1@us.af.mil402-232-0067
Scope Summary (Sanitized Plain Text from SAM.gov)
Project Description (RFO 5.101(c)(4)(i)): The 55th Contracting Squadron requires professional Architect-Engineer (A-E) civil, structural, and geotechnical design services to redesign Deterrence Park (Project SGBP 20-0077) at Building 1000, Offutt Air Force Base, Nebraska. The requirement includes geotechnical investigation and foundation redesign to support static display missile loads, utility and footing conflict resolution, and the delivery of finalized construction drawings, technical specifications, and cost estimates. Procedures and Timeline (RFO 5.101(c)(4)(ii)): This proposed contract action is valued below the Simplified Acquisition Threshold (SAT) and will be awarded as a Firm-Fixed-Price contract utilizing negotiated sole-source procedures under RFO Part 15 and 10 U.S.C. § 3204(a)(1). The anticipated award date is 13 December 2026. Reason Competition is Precluded & Intended Source (RFO 5.101(c)(4)(vii)): The Government intends to solicit and negotiate on a sole-source basis directly with The Schemmer Associates (CAGE: 0CBU3; 1044 North 115th Street, Suite 300, Omaha, NE 68154-4410). Award to any other source is precluded because The Schemmer Associates is the original D…
Source extract: Sun, 22 Nov 2026 04:30:19 GMT. SAM.gov is the sole authoritative legal record. Verify amendments, Q&A, and mandatory site visits on SAM.gov.