The U.S. Army Corps of Engineers (USACE), Pittsburgh District, has a project as the Canonsburg-Houston Local Protection Project (LPP) is an authorized federal flood damage reduction project spanning over 20,500 linear feet of channel improvements along Chartiers Creek. Originally constructed by USACE in two phases (Houston unit completed in 1970; Canonsburg unit completed in 1976), operation and maintenance responsibilities were subsequently transferred to Washington County. Severe storm events resulted in substantial damage to the channel embankment along the right bank of Chartiers Creek, including displacement of stone protection and loss of subgrade stabilization. This rehabilitation contract encompasses repair and re-armoring of the degraded channel reach to restore federal project integrity and design conveyance capacity. The work is to be completed within 365 calendar days after written Notice to Proceed (NTP). The Anticipated Construction Cost is between $150,000.00 and $350,000.00. The North American Industrial Classification Code (NAICS) is 237990 - Other Heavy and Civil Engineering Construction. The Small Business Size Standard is $45,000,000.00. Any resultant award wil…
Pennsylvania Federal Heavy & Civil Engineering Construction Contracts
Deduplicated SAM.gov solicitations, 12-month USASpending award amounts, and contracts nearing expiration in Pennsylvania. Free to browse with no account required.
Plus 2 early/market notices (Sources Sought, Presolicitation, Special Notice). 4 SB set-asides · 165 open nationwide.
USASpending award obligations (2025-11-22 to 2026-11-22; all 12 positive awards >$0; mean $7.13M). Compare scope and duration before quoting.
Contracts ≥$25k nearing Period of Performance end date ($39.52M total value), with 1 in the 6–12m window. Not confirmed new solicitations.
Active Federal Heavy Civil Construction Notices in Pennsylvania (5)
Deduplicated by Sol# · Out-of-state work excludedSee attached, Sources Sought Notice: Cape May Railroad Dredged Material Placement Facility (DMPF) Maintenance Repairs.---- Your response to this survey is requested by 12:00 PM Eastern Time, 2 December 2026. Please send responses to this sources sought via email to Jessica Hazen at Jessica.A.Hazen@usace.army.mil and Cierra Vega at Cierra.R.Vega@usace.army.mil. Include in the title W912BU27BA009 Sources Sought Cape May Railroad DMPF as the subject line in email communications. All submitted responses must be in either Microsoft Word or Adobe pdf format.
The Millvale LPP was constructed by U.S. Army Corps of Engineers (USACE) in 1980 under the authority of Section 205 of the Flood Control Act of 1948 as amended. The project consists of about 6,200 feet of channel improvement including concrete gravity retaining walls, concrete wall supports, anchored concrete toe blocks, concrete cap walls, stone-filled gabion mattresses, flap gates and access ramps. The LPP is an urban Flood Control Work (FCW), and it is not a multipurpose project. Heavy rains from 1-12 April 2024 caused flooding which damaged the Project within Girtys Run, including bank erosion, shoaling, erosion of the improved channel, ruptured gabion baskets, washed-out concrete buttresses, and erosion of grouted riprap. Of particular concern are the washed-out buttresses which have migrated to the center of the improved channel, impeding streamflow. If the buttresses are not removed and stream bank improvements continue to deteriorate, there is a risk that debris will continue to accumulate and could ultimately damage the channel downstream of the impediment. To address these damages, Allegheny County requested rehabilitation assistance from USACE through the PL 84-99 progr…
PRESOLICITATION NOTICE: (this is a Presolicitation Notice only. All documents, including, but not limited to, Specifications, Drawings, and Wage Determination, will be posted to the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module once the Request for Proposal is posted. Proposals or any other documentation is not required for this Presolicitation Notice. Please refer to paragraph 7 for more information). Action Type: Presolicitation Notice (Request for Proposals) Project Title: AT Courtyard Construction & Site Utility Infrastructure Project Location: Bettis Laboratory, West Mifflin, Allegheny County, Pennsylvania Site Owner / Operating Contractor: Naval Nuclear Laboratory / Fluor Marine Propulsion, LLC (PO Box 79, West Mifflin, PA 15122-0079) Procuring / Contracting Activity: U.S. Army Corps of Engineers (USACE), Pittsburgh District (Notice regarding facility jurisdiction: Work will be performed on-site at Bettis Laboratory, an operating Naval Nuclear Laboratory facility, not a USACE facility. USACE personnel and contract administration will be coordinated via an on-site field trailer located at the project site.) (1) Point of Contact All inquiries concern…
The project consists of Maintenance Dredging within the North Side (Wharf N) of Reserve Basin and Schuylkill River Access Channel for the Government sites at the Philadelphia Navy Yard in the Public Works Department Pennsylvania area of responsibility. Maintenance dredging of approximately 96,611 cubic yards of sediment, using a sealed environmental clamshell bucket. Dredging within the Reserve Basin is in support of the Naval Support Activity Mechanicsburg, Philadelphia Navy Yard Annex. The Reserve Basin is being used to decommission various US Naval vessels. For the river pilots to be able to safely maneuver vessels through the Schuylkill River into the Reserve Basin berths and to ensure that tidal cycles will not cause sediment accumulation around the hulls making final removal very difficult, the berths need to be dredged to a minimum depth of -30 MLLW and a maximum over-dredge depth of -32 MLLW.
Get the free Pennsylvania Heavy Civil Construction Monday digest.
One trade. One state. Delivered every Monday morning with deduplicated SAM.gov notices, past award context, and contracts nearing expiration. No account or credit card required.
Recent Past Awards
USASPENDING · >$0| Prime Awardee & Agency | Amount | Period |
|---|---|---|
NORFOLK DREDGING COMPANY Department of Defense THE U.S. ARMY CORPS OF ENGINEERS (USACE), PHILADELPHIA DISTRICT HAS A REQUIREMENT FOR THE MAINTENANCE DREDGING, DELAWARE RIVER, PHILADELPHIA TO SEA AND WILMINGT | $27.25M | 2026-11-15 → 2027-07-13 |
CHIVERS CONSTRUCTION CO INC Department of Agriculture PA-112 THATCHER RUN REPAIR STORMWATER DAMAGE. CONNEAUTVILLE DAM, REHABILITATION, CRAWFORD COUNTY PA | $178,000 | 2026-10-01 → 2026-12-01 |
TRACKS UNLIMITED, LLC Department of Defense REPAIR BENT RAIL AT SWITCH 53A (NSA-M - NAVSUP WSS) | $650,292 | 2026-07-20 → 2026-11-02 |
OHIO RIVER SALVAGE INC Department of Defense EMERGENCY DREDGING NEAR LOCK AND DAM 4 OF ALLEGHENY RIVER | $276,235 | 2026-07-16 → 2026-11-19 |
CURTIN MARITIME CORP Department of Defense THE U.S. ARMY CORPS OF ENGINEER (USACE), PHILADELPHIA DISTRICT (NAP), ANTICIPATES AWARDING A FIRM-FIXED PRICE (FFP) CONSTRUCTION CONTRACT FOR THE MAINTENANCE DR | $12.27M | 2026-07-08 → 2027-04-06 |
ALLISON PARK CONTRACTORS, LLC Department of Defense THE SCOPE OF WORK CONSISTS OF CONSTRUCTING A REINFORCED CONCRETE ROCK ANCHOR WALL ALONG THE RIGHT SIDE OF THE EMERGENCY SPILLWAY, ADJACENT TO KETTLE CREEK ROAD | $17.06M | 2026-07-01 → 2029-06-30 |
A-N-O OILFIELD SERVICE LLC Department of Agriculture NORMAL AND HEAVY MAINTENANCE ON THE ALLEGHENY NATIONAL FOREST ROCKY GAP MOTORIZED TRAIL SYSTEM. | $104,377 | 2026-04-22 → 2026-06-30 |
SAF INC Department of Defense BRADDOCK LOCKS AND DAM HYDRAULIC SYSTEM UPGRADES. | $10.59M | 2026-04-09 → 2028-04-22 |
Expiring-Contract Watchlist
NEXT 12M · ≥$25KBased on USASpending Period of Performance Current End Dates. Expiration does not guarantee a new solicitation.
| Incumbent & Agency | Value | End Date |
|---|---|---|
CURTIN MARITIME CORP Department of Defense · W912BU26CA027 | $12.27M | 2027-04-06 |
NORFOLK DREDGING COMPANY Department of Defense · W912BU26CA032 | $27.25M | 2027-07-13 |
Bidding basics for Pennsylvania federal heavy civil construction
NAICS 237990 & Size Standard
SBA small-business ceiling: $45.0M. Typical Product Service Code: Y1 / Z2 (Civil Works, Drainage, Marine & Flood Control).
Wages & Compliance
Davis-Bacon Act prevailing wages and Miller Act surety bonding requirements commonly apply.
Methodology & Verification